KRB Installations case studies

Case Studies

Home  /  Case Studies

Our work

Recent installation case studies

A look at how KRB Installations has delivered for commercial clients across a range of sectors.

Peterborough

Kelway (UK) Ltd

KRB worked with the developer, Artisan (UK) Developments Ltd, on the initial construction phase to deliver a scheme that achieved BREEAM Excellent, an industry benchmark for energy efficiency.

Wellingborough

Full Support Healthcare

KRB provided a complete lighting design and installation service, delivered to meet the client's specifications.

Eaton Socon

Black Teknigas & Electro Controls

KRB provided a full electrical design and build service, working with the developer and the client to deliver a bespoke solution that catered for all their operational needs and minimised the disruption caused by the relocation.

Could your project be our next case study?

Talk to KRB Installations about delivering a bespoke electrical or cabling solution for your business.

Get in Touch Freephone 0800 583 3300